BOQ Audit General Construction

BOQ audited for spec gaps, quantity anomalies, and pricing errors; bids levelled into a Schedule of Values; inspection checklist and escalation clauses ready for use

The bid came in low. Low bids are where the claims come from.

Inputs

  • πŸ“‹ Contractor BOQ(s)
  • πŸ“‹ Project context (sector, region, currency, scope summary)
  • πŸ—ΊοΈ Drawings (RCP, plans) if available
  • πŸ“… Tender deadline and award timeline

What BOB Does

  1. **boq-audit (audit-boq)** β†’ using `--alias {matter-alias}`, parse the contractor BOQ, run the four audit passes (spec-gap, quantity-validation, EO-pricing, cost-completeness), produce markdown audit report + JSON anomaly array with NLM citations on every flag
  2. **boq-audit (level-bids)** β†’ normalise all contractor bids into a Schedule of Values, flag "too good to be true" rates, buried preliminaries, and missing line items
  3. **Review audit and SOV findings with owner-rep or QS** β€” walk through Critical and High flags, agree which to challenge with contractor, agree the lowest responsible bidder advisory
  4. **Issue findings to contractor** with 7-day response window for itemised re-bid or clarifications
  5. **boq-audit (inspection-checklist)** β†’ derive a site inspection checklist from the audited BOQ β€” mock-up requirements, MEP coordination points, hold-points before installation
  6. **Owner-rep makes award decision** based on audit + SOV + contractor responses + capacity assessment. Award is binding only at this step

Outputs

    Time Savings ~1-2 days for single BOQ; 2-3 days for multi-bid leveling manual β†’ automated with agent assistance
    Try It "BOQ or contractor bid received for a general construction project (residential, commercial, mixed-use) β€” needs auditing before award or payment"
    Compounding Each run refines templates and context β€” 3 automated steps improve with accumulated data